Home / Showcase / Long time in the making!!!!

Long time in the making!!!!

TV and RTI control system

Before & After

1 3
2 3
Before After

Before

This room was existing and the client has just never got the room to where they wanted it. Our team came in and built the step up , installed LED step lighting, carpet and got to work on the AV system installing an Epson 9300 ISF projector, Yamaha RXA amplifier along with a new LG 86” TV and RTI control system

After

Components in this room included:
– Epson TW9300 – ISF Projector
– Existing Screen Technics 100” motorised Screen
– LG 86” TV
– Yamaha RXA880 Amplifier
– Existing speakers
– RTI XP6 Control processor
– Manhattan New Yorker Config 523 and 320 for both rows seating (Front & Back)
– LED Step lighting on rear step
– Building of rear step up 4000 mm wide x 1800 mm deep – with full width step across.
– Penny Lane carpet supplied for rear step

Home Theatre Installation: We do all the work ourselves!

What makes us different is that we do all the work ourselves, taking into account your needs, lifestyle and budget.

This can involve structural works – which depending on your project could include:

1800 144 199
  • Blocking in walls
  • Building steps ups and platforms
  • Curtains and blinds (supply and installation)
  • Seating and custom (supply and install)
  • Building bulkheads
  • Carpet (supply and installation)
  • Electrical (lighting and powerpoint installation)
  • Custom cabinetry (design, supply and installation).